API RP 65-3

Wellbore Plugging and Abandonment, First Edition

American Petroleum Institute , 06/01/2021

Publisher: API

File Format: PDF

$74.00$148.00


API RP 65-3 First Edition PDF

This document provides guidance for the design, placement, and verification of cement plugs in wells to be temporarily or permanently abandoned, as well as remediation and verification of annular barriers. Wells temporarily abandoned (suspended) are intended to be re-entered in the future. The placement of barriers may depend on whether the well is to be temporarily or permanently abandoned. Cement plug lengths are not considered in this document.

More API Standards PDF

API 613

API 613

$72.00 $144.00

API RP 13D-1995

API RP 13D-1995

$72.00 $144.00

API 612

API 612

$72.00 $144.00

API 526

API 526

$66.00 $133.00