ASME NOG-1-2020

Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)

ASME International , 12/04/2020

Publisher: ASME

File Format: PDF

$89.00$179.00


ASME NOG-1-2020 PDF

This Standard covers electric overhead and gantry multiple girder cranes with top running bridge and trolley used at nuclear facilities and components of cranes at nuclear facilities.

Cranes covered under this Standard shall be designed in accordance with the Standard’s requirements but not necessarily with its recommendations. The word shall is used to denote a requirement, the word should is used to denote a recommendation, and the word may is used to denote permission, which is neither a requirement nor a recommendation.

This Standard covers electric overhead and gantry multiple girder cranes with top running bridge and trolley used at nuclear facilities and components of cranes at nuclear facilities. The items qualified by this Standard are the bridge wheels up through the crane bridge and trolley. The runway rails and rail clips are qualified with the runway and building structure and shall also meet the requirements of paras. 4160 and 4460

ASME NOG-1-2020 History

ASME NOG-1-2020

ASME NOG-1-2020

$89.00 $179.00

ASME NOG-1-2010

ASME NOG-1-2010

$85.00 $170.00

ASME NOG-1-2004

ASME NOG-1-2004

$85.00 $170.00

More ASME Standards PDF

ASME B16.5-2017

ASME B16.5-2017

$136.00 $273.00

ASME B30.13-2017

ASME B30.13-2017

$30.00 $60.00

ASME A112.19.3-2017/CSA B45.4-17
ASME A18.1-2017

ASME A18.1-2017

$49.00 $98.00