• ASTM E1281-15

ASTM E1281-15

Standard Guide for Nuclear Facility Decommissioning Plans

ASTM International , 06/01/2015

Publisher: ASTM

File Format: PDF

$31.00$62.00


1.1This guide applies to decommissioning plans for any nuclear facility whose operation was (is) governed by Nuclear Regulatory Commission (NRC), Agreement State license, under Department of Energy (DOE) orders, or whose operation was overseen by another federal, state, or local agency.

1.2The guide applies to the preparation and content of the decommissioning plan document itself.

1.3The detailed description and development of implementation plans identified in Section 4 is outside the scope of this guide.

Note 1:Nuclear facilities operated by the U.S. DOE are not licensed by the U.S. NRC, nor are other nuclear facilities which may come under the control of the U.S. Department of Defense or individual agreement states. The references in this guide to licensee, U.S. NRC Regulatory guides, and Title 10 of the U.S. Code of Federal Regulations are to imply appropriate alternative nomenclature with respect to DOE, DOD, or agreement state nuclear facilities. This distinction should not alter the content of decommissioning plans for nuclear facilities.

1.4This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

ASTM E1281-15 History

ASTM E1281-15(2021)

ASTM E1281-15(2021)

$26.00 $52.00

ASTM E1281-15

ASTM E1281-15

$31.00 $62.00

ASTM E1281-10

ASTM E1281-10

$29.00 $58.00

More ASTM Standards PDF

ASTM D972-02(2008)

ASTM D972-02(2008)

$26.00 $52.00

ASTM C1149-08

ASTM C1149-08

$30.00 $60.00

ASTM F1244-08

ASTM F1244-08

$29.00 $58.00

ASTM F1111-08a

ASTM F1111-08a

$25.00 $50.00