• AWWA ACE61880

AWWA ACE61880

Reconciliation of Engineered Asset Valuation for Dallas Water Utilities

American Water Works Association , 06/17/2005

Publisher: AWWA

File Format: PDF

$12.00$24.00


This paper presents a case study in the development of condition assessments and engineered asset valuations for the water distribution system facilities for Dallas Water Utilities (DWU), and summarizes the coordination of the project with a comprehensive Asset Management System that will meet the requirements established by the General Accounting Standards Board Statement No. 34 (GASB 34). The City of Dallas is in the process of procuring and implementing an Asset Management System which will be used to track the service level of the City's assets including those assigned to DWU plus fifteen other departments. In 2002, DWU initiated work on the Water Capital Infrastructure Assessment and Hydraulic Modeling Project. Engineering evaluations were conducted to assign an overall condition rating, estimated current and replacement value, and estimated remaining life to each facility. A detailed review of the condition assessment and asset valuation methodologies is presented. The calculated reinvestment needs for replacement of aging facilities is compared to information provided in the 2001 AWWA report, "Dawn of a Replacement Era". A Fixed Asset Management Guidance Memorandum will be prepared for the project which outlines the GASB 34 assumptions of DWU and the City of Dallas and the coordination needed between the two entities in order to manage DWU assets. The need to reconcile assets, and the need for revisions in procedures to meet GASB 34 requirements is discussed. Includes 8 references, tables, figures.

More AWWA Standards PDF

AWWA SOURCES55595

AWWA SOURCES55595

$12.00 $24.00

AWWA WQTC57039

AWWA WQTC57039

$12.00 $24.00

AWWA ACE56353

AWWA ACE56353

$12.00 $24.00

AWWA SOURCES55666

AWWA SOURCES55666

$12.00 $24.00