• AWWA ACE63096

AWWA ACE63096

Integrated Water Infrastructure Master Planning for Dallas Water Utilities

American Water Works Association , 06/01/2006

Publisher: AWWA

File Format: PDF

$12.00$24.00


This slide presentation outlines integrated water infrastructure master planning for Dallas Water Utilities (DWU). Project objectives included: prepare for future growth; reinvestment / renewal of existing infrastructure; and, GASB 34 Compliance. Topics outlined include: complexity of DWU; phased project approach designed to effectively meet DWU's needs; model attribution and data sets; model calibration and results; pipeline assessment approach; rehab/replacement program; remaining life of existing infrastructure; and, distribution system asset value evaluation. Includes tables, figures.

More AWWA Standards PDF

AWWA WQTC52942

AWWA WQTC52942

$12.00 $24.00

AWWA IMTECH51452

AWWA IMTECH51452

$12.00 $24.00

AWWA WQTC52949

AWWA WQTC52949

$12.00 $24.00

AWWA IMTECH51447

AWWA IMTECH51447

$12.00 $24.00