• AWWA DSS58692

AWWA DSS58692

Reservoir Rehabilitation or Demolition? How and Why the City of Huntington Beach Chose to do Both

American Water Works Association , 10/01/2003

Publisher: AWWA

File Format: PDF

$12.00$24.00


This paper explores the collaboration between City of Huntington Beach, California staff and the design team to develop innovative ideas to resolve difficult design, construction and operational issues for the Overmyer Reservoir Renovation Project in Huntington Beach, California. Includes tables.

More AWWA Standards PDF

AWWA WQTC56948

AWWA WQTC56948

$12.00 $24.00

AWWA ACE56285

AWWA ACE56285

$12.00 $24.00

AWWA SOURCES55593

AWWA SOURCES55593

$12.00 $24.00

AWWA WQTC56950

AWWA WQTC56950

$12.00 $24.00