• AWWA INF52164

AWWA INF52164

Assessing the Prioritization of Capital Improvements for Twenty-Six Open-Cut Reservoirs

American Water Works Association , 01/01/2000

Publisher: AWWA

File Format: PDF

$12.00$24.00


The East Bay Municipal Utility District of Oakland, California, owns and operates 26 open-cut reservoirs within its water distribution system. The oldest was constructed in 1884 and the newest in 1992. The purpose of this paper is to explain the development of the methodology for the improvement of the District's open-cut water distribution reservoirs. The proposed rehabilitation work required for each reservoir with corresponding cost estimates is prioritized based on improving water quality, worker safety, and water distribution reliability. District operations, maintenance, and the various regulatory agencies' requirements are also considered. Includes tables.

More AWWA Standards PDF

AWWA WQTC52952

AWWA WQTC52952

$12.00 $24.00

AWWA 51729

AWWA 51729

$12.00 $24.00

AWWA WQTC52954

AWWA WQTC52954

$12.00 $24.00

AWWA 51727

AWWA 51727

$12.00 $24.00