• AWWA INF53968

AWWA INF53968

Resolving Design and Construction Issues of Large Diameter Pipelines

American Water Works Association , 06/01/2001

Publisher: AWWA

File Format: PDF

$12.00$24.00


The San Diego County Water Authority completed construction of Pipeline 5Extension, Phase II, commonly known as the Rancho Pe¿asquitos Pipeline during1998. This paper describes a number of solutions to challenges encountered duringdesign and construction, which may be beneficial to other major infrastructureprojects. This project addressed challenges in providing operational flexibilityto handle present, future, and emergency conditions, right-of-way restrictions,steep terrain, urban construction, protection of existing streams, multiple pipejoint designs, and special consideration for public coordination. Includes figures.

More AWWA Standards PDF

AWWA DSS60339

AWWA DSS60339

$12.00 $24.00

AWWA IMTECH59622

AWWA IMTECH59622

$12.00 $24.00

AWWA DSS60340

AWWA DSS60340

$12.00 $24.00

AWWA IMTECH59621

AWWA IMTECH59621

$12.00 $24.00