• AWWA MTC61138

AWWA MTC61138

Optimizing Existing Facilities

American Water Works Association , 03/01/2005

Publisher: AWWA

File Format: PDF

$12.00$24.00


This slide presentation outlines information on Cape Coral Utilities' plan to optimize their existing treatment facilities to satisfy increasing water demand due to population growth in the area. Topics covered include: Cape Coral buildout schedule; two focuses of water demand growth that included an interim increase in capacity at the existing plant of approximately 2MGD, and parallel North Plant capacity of 12MGD (including bypass) required to be operational in 2007; Cape Coral wellfields; projected water quality; existing plant descriptions; considered alternatives and impacts; blend stream; concentrate discharge; and, increasing existing plant capacity. Includes tables, figures.

More AWWA Standards PDF

AWWA ACE70656

AWWA ACE70656

$12.00 $24.00

AWWA ACE70598

AWWA ACE70598

$12.00 $24.00

AWWA JTMGT69641

AWWA JTMGT69641

$12.00 $24.00

AWWA ACE70865

AWWA ACE70865

$12.00 $24.00