• AWWA RSP64391

AWWA RSP64391

A Risk-Managed Approach to Averting PCCP Failure

American Water Works Association , 03/01/2007

Publisher: AWWA

File Format: PDF

$12.00$24.00


This slide presentation begins with an outline of the City of Phoenix, Arizona's Large Water Main Assessment Program. It outlines the city of Phoenix's risk-managed approach to averting pre-stressed concrete cylinder pipe (PCCP) and covers topics that include: pipeline prioritization; elements of a risk assessment; likelihood factors of installation date, waterway proximity and soil corrosivity; consequence factors of pipeline diameter, adjacent land use, and proximity to railways and roadways; geographic information system (GIS)-Based Analysis; hydraulic modeling; Phoenix water model; demand, production, and evaluation of system impacts; and, PCCP Assessment Master Plan. Includes figures.

More AWWA Standards PDF

AWWA ACE69019

AWWA ACE69019

$12.00 $24.00

AWWA ACE68696

AWWA ACE68696

$12.00 $24.00

AWWA ACE69097

AWWA ACE69097

$12.00 $24.00

AWWA ACE68818

AWWA ACE68818

$12.00 $24.00