• AWWA WSP57720

AWWA WSP57720

Pilot Water Restriction Program for the Osprey Area

American Water Works Association , 03/19/2003

Publisher: AWWA

File Format: PDF

$12.00$24.00


The objective of this slide presentation was to change the allowable irrigation days in the Osprey area from the current SWFWMD guidelines to a five day watering schedule. Projected results are discussed and include: increased water conservation; increased public understanding of the watering program; removal of peaks in potable demand during irrigation days; decreased reports of "dry wells"; and, reduction of stress levels on the surficial aquifer.

More AWWA Standards PDF

AWWA F102-13

AWWA F102-13

$70.00 $140.00

AWWA F101-13

AWWA F101-13

$70.00 $140.00

AWWA C550-13

AWWA C550-13

$70.00 $140.00

AWWA B130-13

AWWA B130-13

$70.00 $140.00