B11 B11.TR8:2022

Guide to Inspection of Risk Reduction Measures

B11 Standards, Inc. , 01/03/2022

Publisher: B11

File Format: PDF

$49.00$99.00


B11 B11.TR8:2022 PDF

The purpose of this Technical Report is to provide guidance for inspecting risk reduction measures as applied to existing safety systems to verify they are within the specified parameters. This Technical Report describes a scalable approach for applications based on the principles of Plan-Do-Check-Act (Adjust/Abandon), and henceforth, simply PDCA (Adjust / Abandon).

More B11 Standards PDF

AWWA M17

AWWA M17

$74.00 $149.00

AWWA B114-16

AWWA B114-16

$70.00 $140.00

AWWA C707-10 (R2016)

AWWA C707-10 (R2016)

$70.00 $140.00

AWWA B100-16

AWWA B100-16

$70.00 $140.00