CSA N290.15:19

Requirements for the safe operating envelope of nuclear power plants

CSA Group , 08/01/2019

Publisher: CSA

File Format: PDF

$445.00$890.00


CSA N290.15:19 PDF

Scope

1.1 This Standard outlines a consensus approach to defining, implementing, and maintaining the SOE at NPPs. Additional guidance is provided in Annex A for operating CANDU® NPPs.

1.2 In this Standard, "shall" is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; "should" is used to express a recommendation or that which is advised but not required; and "may" is used to express an option or that which is permissible within the limits of the Standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.

CSA N290.15:19 History

CSA N290.15:19

CSA N290.15:19

$445.00 $890.00

CSA N290.15-10 (R2015)

CSA N290.15-10 (R2015)

$445.00 $890.00

More CSA Standards PDF

CSA C22.2 NO. 203.1:22

CSA C22.2 NO. 203.1:22

$57.00 $115.00

CSA Z1007:22

CSA Z1007:22

$73.00 $147.00

CSA C22.2 NO. 248.18:22

CSA C22.2 NO. 248.18:22

$135.00 $271.00

CSA C83:22

CSA C83:22

$85.00 $170.00