Your shopping cart is empty!
ASHRAE , 2017
Publisher: ASHRAE
File Format: PDF
$9.00$9.00
The author delves into the integration of a waterside economizer into the chilled water plant of a large data center. The column discusses the project's unconventional piping configuration, how construction was phased to avoid shutdowns, and how cold weather operation was sequenced to avoid freezing water in the cooling towers.
$9.00 $9.00
$102.00 $204.53