IEC 62382 Ed. 1.0 en:2006

Electrical and instrumentation loop check

International Electrotechnical Commission , 11/15/2006

Publisher: IEC

File Format: PDF

$58.00$116.00


describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).

IEC 62382 Ed. 1.0 en:2006 History

IEC 62382 Ed. 3.0 b:2024

IEC 62382 Ed. 3.0 b:2024

$122.00 $245.00

IEC 62382 Ed. 2.0 b:2012

IEC 62382 Ed. 2.0 b:2012

$95.00 $190.00

IEC 62382 Ed. 1.0 en:2006

IEC 62382 Ed. 1.0 en:2006

$58.00 $116.00

More IEC Standards PDF

IEC 61754-13 Ed. 1.0 b:1999
IEEE C135.2-1999

IEEE C135.2-1999

$63.00 $126.00

IEC 60077-2 Ed. 1.0 b:1999

IEC 60077-2 Ed. 1.0 b:1999

$117.00 $235.00

IEC 61540 Ed. 1.1 b:1999

IEC 61540 Ed. 1.1 b:1999

$329.00 $658.00