• NECA 200-2010

NECA 200-2010

Recommended Practice for Installing and Maintaining Temporary Electric Power at Construction Sites (ANSI)

National Electrical Contractors Association , 2010

Publisher: NECA

File Format: PDF

$20.00$40.00


Describes installation procedures for temporary power at construction sites. It covers the planning, installation, expansion, maintenance, cutover, and removal of temporary power systems operating at 600 volts or less. NECA 200 is approved as an American National Standard (ANS).

More NECA Standards PDF

NEMA PRP 4-2009 (R2016)

NEMA PRP 4-2009 (R2016)

$117.00 $235.71

NEMA SBP 1-2010

NEMA SBP 1-2010

$24.00 $49.00

NEMA LSD 53-2010

NEMA LSD 53-2010

$116.00 $233.89

NEMA DC 3, Annex A-2013

NEMA DC 3, Annex A-2013

$37.00 $75.00