PIP STS03600M

Application of ACI 351.4M-14, Specification for Installation of Cementitious Grouting between Foundations and Equipment Bases (Metric) [New Practice]

Process Industry Practices , 12/01/2021

Publisher: PIP

File Format: PDF

$50.00$100.00


This Practice supplements ACI 351.4M-14, Specification for Installation of Cementitious Grouting between Foundations and Equipment Bases (Metric). Together, this Practice and ACI 351.4M-14 provide requirements for supplying, testing and installing nonshrink cementitious grout materials. This Practice is applicable for nonshrink cementitious grout materials installed between foundations and equipment and machinery bases as well as nonshrink cementitious grout materials installed between foundations and structural steel column bases. The requirements of ACI 351.4M-14, as modified and supplemented by this Practice, are adopted by this Practice for supplying, testing and installing nonshrink cementitious grout materials.

PIP STS03600M History

PIP STS03600M

PIP STS03600M

$50.00 $100.00

PIP STS03600M

PIP STS03600M

$50.00 $100.00

More PIP Standards PDF

PIP ELSPS01V-EEDS

PIP ELSPS01V-EEDS

$12.00 $25.00

PIP STS05120

PIP STS05120

$50.00 $100.00

PIP PN01CB1S01

PIP PN01CB1S01

$37.00 $75.00

RTCA DO-331

RTCA DO-331

$107.00 $215.00