• SAE AIR6364

SAE AIR6364

Test Facility Shakedown and Commissioning

SAE International , 11/29/2017

Publisher: SAE

File Format: PDF

$49.00$98.00


SAE AIR6364 discusses in general terms the activities required to be undertaken or demonstrated during the establishment of the facility such as:
  • the assessment checks prior to forwarding to the end users site for embodiment into the facility system
  • the establishment of the facility such as trial installations of hardware, functionality checking of lifting transportation and access systems, centerline pull checks, pressure testing of fuel and air start systems, flushing of wet systems and electrical continuity checking.
  • the commissioning of the facility such as instrumentation calibrations, engine starts, engine running, assessment of command and control system, assessment of DAS system, aerodynamic and acoustic surveys.

More SAE Standards PDF

SAE J343_202310

SAE J343_202310

$43.00 $87.00

SAE AS1582H

SAE AS1582H

$24.00 $49.00

SAE AS81703B

SAE AS81703B

$72.00 $144.00

SAE AS5659

SAE AS5659

$47.00 $94.00