• SAE AS13002

SAE AS13002

Requirements for Developing and Qualifying Alternate Inspection Frequency Plans

SAE International , 03/17/2015

Publisher: SAE

File Format: PDF

$58.00$117.00


This document covers the process to be applied to design characteristics (as defined in AS9102), parts or inspection processes as defined by the purchaser. Design characteristics not included within the scope include electronic, electromechanical or mechanical systems where alternative means of acceptance are approved such as through acceptance test procedures (ATPs). This document does not define processes for identifying or communicating the classification of the parts or design characteristics.

This document does not define the procedure to qualify a supplier to undertake these requirements. It is expected that each purchaser will have a procedure to manage the flow-down of these requirements.

This document applies to suppliers that demonstrate adequate proficiency in applicable process control methods as determined by the purchaser.

More SAE Standards PDF

SAE ARP6887

SAE ARP6887

$69.00 $139.00

SAE AIR1752A

SAE AIR1752A

$65.00 $130.00

SAE ARP7131

SAE ARP7131

$77.00 $154.00

SAE J1939/73_202412

SAE J1939/73_202412

$87.00 $174.00