Your shopping cart is empty!
ASHRAE , 2017
Publisher: ASHRAE
File Format: PDF
$26.00$52.00
This product contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.
Preparing equipment and assemblies for final check-out verification, start-up procedure and proper operation requires a coordinated activity of testing, adjusting, measurement and documentation that will ensure a successful result. This session describes how the commissioning process would be applied to achieve a successful chilled water plant operation needed to comply with the owner's project requirement and the design documents.
Run Time: 90 mins.
$26.00 $52.00
$40.00 $80.00
$27.00 $55.00